Image of Roosevelt Island Bridge from NYC Roads
I inquired of RIOC President Steve Shane if the work being done on the Roosevelt Island Bridge last week was completed. Mr. Shane replied:

Yes. All is complete for this round. Expected to repeat for 2 nights at end of June. Back to normal operations until then.