Riverwalk Building 7 Construction Site According to the Roosevelt Island Operating Corp ( RIOC ):

Please be advised that on November 6, from 8:00 AM until 7:30 PM and on November 11 and 12 from 11:00 PM to 6:00 AM, staff wearing personal protective gear will be working on the Island. This is due to construction involving the sewer system at the site of the future Riverwalk 7 building. This is not a cause for alarm as the suits are just a precautionary measure against personal contact with septic materials.

Sincerely,

Roosevelt Island Operating Corp Advisories Group